CCI - CENTRAL PLANT CONTROLLER

Central Plant Controller (CCI)

ARERA Regulatory Adjustment 385/2025 and 564/2025 for Medium Voltage Photovoltaic Systems

CCI is now a structural element of the National Electric System.
Not an accessory, not an optional extra, not a mere formal obligation. STI REPAIR addresses
CCI adaptation as a real engineering integration issue.

Engineering integration

ICC is not simply a regulatory requirement

With the introduction of the new security requirements of the National Electric System, the Central Plant Controller becomes a structural element of the architecture of PV systems connected to Medium Voltage.

Many operators today face the ICC as a technical-administrative fulfillment. A framework to be installed, a file to be closed, a requirement to be met.

STI REPAIR addresses this as a real engineering integration problem.

The CCI does not work alone. It works together with the inverters, dialogues with the grid operator, governs power modulation, and directly affects the stability of the system.

And it is in the interaction between CCI and inverter that the difference between a simple installation and a technically sound integration arises.

Central Plant Controller (CCI)

the regulatory framework

The obligation to comply with the Central Plant Controller (CCI) is defined by ARERA Resolutions 385/2025/R/EEL and 564/2025/R/EEL, in continuity with the Terna Network Code, the RIGEDI procedure (Annex A.72) and the CEI 0-16 standard.

The provisions introduce stringent requirements to ensure the security and stability of the National Electricity System, imposing new standards of observability and control over distributed generation facilities.

DELIBERAZIONE ARERA 385/2025/R/EEL

Pubblicata il 5 agosto 2025, introduce l’obbligo di integrazione del CCI con funzionalità di limitazione della potenza attiva (PF2), in coerenza con l’Allegato A.72 al Codice di Rete Terna.

DELIBERAZIONE ARERA 564/2025/R/EEL

Pubblicata il 23 dicembre 2025, definisce la proroga dei termini previsti dalla Delibera 385/2025 e introduce strumenti progressivi per garantire la sicurezza del sistema nelle stagioni 2026 e 2027.

REQUISITI TECNICI INTRODOTTI

OSSERVABILITÀ DELL’IMPIANTO (PF1)

Monitoraggio continuo dei parametri elettrici e trasmissione dati al gestore di rete.

LIMITAZIONE DELLA POTENZA ATTIVA (PF2)

Ricezione ed esecuzione dei comandi di modulazione o distacco della produzione.

COMANDI REMOTI DI SPEGNIMENTO

Gestione centralizzata dell’arresto dell’impianto in condizioni di emergenza o instabilità.

LOGICHE DI RIAVVIO AUTOMATICO

Ripristino controllato dell’impianto secondo i parametri previsti dalla normativa CEI 0-16.

Engineering integration

WHAT IS CENTRAL PLANT CONTROLLER

The Central Plant Controller (CCI) is the device that enables structural interfacing between the grid operator, the plant control system and the generation inverters.

It is not an accessory and is not an isolated component: it is the logical node that governs communication, modulation, and operational safety of the Medium Voltage system.

WHY IS STI REPAIR DIFFERENT?

Integration on any inverter

CCI can be installed by many operators. The real difficulty is getting it to work properly on any inverter.

STI REPAIR was established as a center specializing in the repair and remanufacturing of photovoltaic inverters. Our expertise does not come from external integration. It comes from daily work inside the machines. The ICC does not work alone works together with the inverters, this means integrating the ICC without compromising the technical balance of the system.

ARCHITETTURE HARDWARE

Conoscenza diretta dei circuiti, dei componenti e delle logiche interne degli inverter di ogni generazione.

LOGICHE DI CONTROLLO

Padronanza dei firmware, dei protocolli di comunicazione e delle dinamiche reali di modulazione della potenza.

SISTEMI DI PROTEZIONE

Esperienza sulle soglie di sicurezza, relè di interfaccia e condizioni di riavvio automatico secondo CEI 0-16.

SCHEMI ELETTRICI INTERNI

Documentazione tecnica, reverse engineering e intervento diretto su inverter legacy fuori produzione.

CCI integration on every generation of inverters

NEXT-GENERATION AND LEGACY INVERTERS

Nuova generazione

INVERTER DI NUOVA GENERAZIONE

Sugli inverter più recenti l'integrazione con il CCI avviene tramite protocolli di comunicazione digitali dedicati.

  • Ethernet
  • RS-485
  • Protocolli proprietari

Nella pratica questo richiede aggiornamenti firmware, installazione di schede di comunicazione e configurazioni tecniche specifiche.

Per STI REPAIR sono attività ordinarie, perché conosciamo come gli inverter comunicano realmente, non solo come dovrebbero comunicare.

Nodo critico

INVERTER LEGACY: IL VERO NODO CRITICO

Una parte rilevante del parco fotovoltaico installato è costituita da inverter fuori produzione, privi di supporto del costruttore e non progettati per la modulazione o il riavvio automatico.

  • Modelli non più supportati
  • Assenza di firmware aggiornabili
  • Limitazioni hardware strutturali
La differenza STI REPAIR

Molti operatori propongono la sostituzione dell'inverter. STI REPAIR interviene direttamente sull'architettura elettrica e funzionale per integrare il CCI senza compromettere il valore dell'impianto.

SELECTED TECHNOLOGY

THE CCI CHOSEN BY STI REPAIR: HIGECO MORE

For the retrofitting of our facilities, we chose Higeco More, an established industrial platform designed before the ARERA regulations came into force.

Not a solution created to chase regulatory obligation, but a system designed to govern real, complex, and structured facilities.

Beyond regulatory compliance

WITH STI REPAIR
THE RESULTS ARE CONCRETE

  • Impianto conforme alla normativa vigente
  • Inverter operativi, senza interruzioni
  • Valore dell'impianto preservato nel tempo
  • Nessuna sostituzione inutile o costosa

Risolviamo i problemi che emergono quando la normativa incontra la realtà degli impianti.
Raccontaci la tua situazione: valutiamo insieme la soluzione più efficace.